<html><head><meta http-equiv="content-type" content="text/html; charset=utf-8"></head><body dir="auto">Did my duse make it ca for club mamber ship just checking my check got there <br id="lineBreakAtBeginningOfSignature"><div dir="ltr">Sent from my iPhone</div><div dir="ltr"><br><blockquote type="cite">On Mar 20, 2024, at 1:13 AM, glgslewis@comcast.net wrote:<br><br></blockquote></div><blockquote type="cite"><div dir="ltr"><span>Message From:   glgslewis@comcast.net</span><br><span></span><br><span></span><br><span></span><br><meta http-equiv="Content-Type" content="text/html; charset=us-ascii"><meta name="Generator" content="Microsoft Word 15 (filtered medium)"><style>@font-face { font-family: "Cambria Math"; }
@font-face { font-family: Calibri; }
p.MsoNormal, li.MsoNormal, div.MsoNormal { margin: 0in; font-size: 11pt; font-family: Calibri, sans-serif; }
span.EmailStyle19 { font-family: Calibri, sans-serif; color: windowtext; }
.MsoChpDefault { font-size: 10pt; }
@page WordSection1 { size: 8.5in 11in; margin: 1in; }
div.WordSection1 { page: WordSection1; }</style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext="edit" spidmax="1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext="edit">
<o:idmap v:ext="edit" data="1" />
</o:shapelayout></xml><![endif]--><div class="WordSection1"><p class="MsoNormal">All,<o:p></o:p></p><p class="MsoNormal">Jere and I had done the initial work on Saturday, but we had an electrical issue which we couldn’t resolve in the time we had.  Wayne Toigo and I spent 4 hours there today and sorted everything out.  New switch is installed and a new short piece of connecting track at the end of one of the legs.  The piece replaced was probably the source of derailments.  Wayne sorted out the electrical issue so we’re good to go.  BTW, the old brass wire cranking linkage for throwing the switch was replaced with a single steel wire in a 3/8” inch hole in the sub-roadbed which is the way the Tortoises were designed to work.  Simple.  No monkey motion.  <o:p></o:p></p><p class="MsoNormal"><o:p> </o:p></p><p class="MsoNormal">I will be picking up the Good-Guys passes either tomorrow or Thursday so distribution will be Friday night.  If that doesn’t work for you, contact me to make other arrangements.  <o:p></o:p></p><p class="MsoNormal"><o:p> </o:p></p><p class="MsoNormal">The Fair is working up the agreement for the HVAC system and I was told it should be ready for our review sometime this week.  <o:p></o:p></p><p class="MsoNormal"><o:p> </o:p></p><p class="MsoNormal">Gary Lewis<o:p></o:p></p><p class="MsoNormal"><o:p> </o:p></p><div><div style="border:none;border-top:solid #E1E1E1 1.0pt;padding:3.0pt 0in 0in 0in"><p class="MsoNormal"><b><span style="mso-ligatures:none">From:</span></b><span style="mso-ligatures:none"> glgslewis@comcast.net <glgslewis@comcast.net> <br><b>Sent:</b> Sunday, March 17, 2024 7:55 AM<br><b>To:</b> 'Alameda County Central Railroad Society' <accrs@mail.accrs.org>; 'ACCRS HO Scale' <accrs-ho@mail.accrs.org>; 'main@accrs.groups.io' <main@accrs.groups.io><br><b>Subject:</b> Summit switch work<o:p></o:p></span></p></div></div><p class="MsoNormal"><o:p> </o:p></p><p class="MsoNormal">Due to work being done on the Summit switch, DO NOT ATTEMPT TO RUN ANYWHERE NEAR THE BLOCKS INVOLVED and do not turn them on.  Maintenance should be completed on Tuesday. <o:p></o:p></p><p class="MsoNormal"><o:p> </o:p></p><p class="MsoNormal">Gary Lewis <o:p></o:p></p></div><span>_______________________________________________</span><br><span>Accrs mailing list</span><br><span>Accrs@mail.accrs.org</span><br><span>https://mail.accrs.org/cgi-bin/mailman/listinfo/accrs</span><br></div></blockquote></body></html>