[Accrs] Video Shoot

Alameda County Central Railroad Society accrs at mail.accrs.org
Sat Apr 14 10:05:28 PDT 2018


Dick Stark thought we would like to do the shoot before the fair. If this
is the case we will have to start preparations soon, particularly on the O
side.

Has the HO side been informed?

The HO layout has many more points of interest. Perhaps they would like to
do a shoot similar to Crockett - a train passing through the scenic points
of the layout, with descriptions of the major the points of interest, and
with verbal comments on each location. In this video one train was the
central character with a couple of others in small cameo roles.

With a simple track plan, and much fewer scenic points of interest, the O
side should focus on the trains. The Zephyrs, early diesels, Hiawatha and
others may be included. It is impossible to do this without preparation. I
think I recall that we tried something like this many years ago and it went
nowhere. We just stumbled around.

As far as I know, Mike G. is the only one who has gone through the
experience so we need to learn from Mike.

If it's possible, we may want to do a separate shoot for each side.

There are a limited number of weeks before the fair. I suspect we will have
to do it later.

Ted
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mail.accrs.org/archives/accrs/attachments/20180414/aae568af/attachment.html>


More information about the Accrs mailing list