<html><head></head><body><div class="ydp936fd11byahoo-style-wrap" style="font-family:Helvetica Neue, Helvetica, Arial, sans-serif;font-size:13px;"><div><div dir="ltr" data-setdir="false">Hi Folks,</div></div><div dir="ltr" data-setdir="false"><br></div><div dir="ltr" data-setdir="false">We run into an issue in the hidden yard yesterday evening.</div><div dir="ltr" data-setdir="false">Track 9 was out of service due to a switch failing.</div><div dir="ltr" data-setdir="false">Tracks 1 to 7 were occupied by parked trains ( Club stuff and member trains).</div><div dir="ltr" data-setdir="false">That left only track 8 open for putting up trains and taking them down which lead to a long shift change over.</div><div dir="ltr" data-setdir="false"><br></div><div dir="ltr" data-setdir="false">Please remove your trains completely if you are not having an immediate shift the next day, e.g shift 3 to shift 1.</div><div dir="ltr" data-setdir="false">Leave tracks 9, 8, 7, 6 open when you leave for the day AND it is 3rd shift, unless you are back first shift the next day.</div><div dir="ltr" data-setdir="false">I will remove the club cars from tracks 3&4 to make some room though.</div><div dir="ltr" data-setdir="false"><br></div><div dir="ltr" data-setdir="false">- Jorg</div><div dir="ltr" data-setdir="false"><br></div><div dir="ltr" data-setdir="false">Here is a bad example of a train parked through shifts when the member is not at the fair, blocking track 4 in the passenger station.</div><div dir="ltr" data-setdir="false"><br></div><div dir="ltr" data-setdir="false"><img title="Inline image" alt="Inline image" src="cid:0d6161db-ed54-fee6-82cf-902ff759c7ca@yahoo.com" class="yahoo-inline-image" draggable="false" style="max-width: 800px; width: 100%;" data-id="<0d6161db-ed54-fee6-82cf-902ff759c7ca@yahoo.com>"><br></div></div></body></html>