[Accrs-ho] New Bridge - Layout severed

ACCRS HO Scale accrs-ho at mail.accrs.org
Sun May 1 03:58:32 PDT 2016


Here's what it looks like.  BTW, I had some work to do on the center support later in the day and took it back this evening.  The bridge, center support, and shims at the ends are in place but just setting there as in this picture.  Please don't mess with it.  

Gary

-----Original Message-----
From: Accrs-ho [mailto:accrs-ho-bounces at mail.accrs.org] On Behalf Of ACCRS HO Scale
Sent: Saturday, April 30, 2016 6:24 PM
To: ACCRS - HO
Subject: [Accrs-ho] New Bridge - Layout severed

Message From: Dean & Margaret Lewis  lewis2 at earthlink.net

Group,

Gary and I pulled the old wood trestle out today and I helped him (he is 
the engineer) create the necessary bench work to install the bridge.   
The bridge is built, etc.

Please don't handle the bridge.   It was left up on the layout on the 
track going into Mesa.   The scenery is next.   I will be putting that 
in over the next week or so.   Until I get the new bridge installed, you 
can not use the helix going up or coming down from Summit.

That tight spot everyone complains about going into the tunnel that takes trains to the lower level under the city is gone.  There was way too much plaster there and a couple of whacks with a hammer and the top coat fell of and left a perfectly useable under layer.

You can still test run on the lower tracks like 11, 12, 14, etc.

Hope to get it back up running soon.

Dean
_______________________________________________
Accrs-ho mailing list
Accrs-ho at mail.accrs.org
https://mail.accrs.org/cgi-bin/mailman/listinfo/accrs-ho
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Image.png
Type: image/png
Size: 916290 bytes
Desc: not available
URL: <https://mail.accrs.org/archives/accrs-ho/attachments/20160501/f79e7412/attachment-0001.png>


More information about the Accrs-ho mailing list