[Accrs-ho] ACRS HO minutes for January
ACCRS HO Scale
accrs-ho at mail.accrs.org
Thu Feb 4 15:18:11 PST 2016
Members,
I can not seem to find my hand written minutes. I have everything else
that was presented that evening, but not the minutes. Did I give them
to either the new trainmaster or someone else to type up???
I handed out some concept sheets that night. Maybe the one with the
notes was not returned or Gary has it.
Anyway,
We discussed doing limited signaling on the more visible sections of
track such as in front of the control panel, the port, etc. Signal
bridges are in the HO locker that could be used to start the process.
I presented an idea to replace the wooden trestle structure that spans
the track below the helix. Members thought it was a good idea and gave
approval to research.
Without my notes, I can't remember what else we discussed. See attached
for bridge ideas. We liked the girder bridge and Deck Truss bridge combo.
I have purchased the regular double track truss bridge 933-4510. We
would need a couple of the new deck truss bridges 933-4520 to complete
the project.
Very strange that the notes are missing.
Dean
-------------- next part --------------
A non-text attachment was scrubbed...
Name: EngineeredBridgeSystem.pdf
Type: application/pdf
Size: 4408310 bytes
Desc: not available
URL: <https://mail.accrs.org/archives/accrs-ho/attachments/20160204/42e5fcf4/attachment-0001.pdf>
More information about the Accrs-ho
mailing list